| 1. Use power supply with Udc | 1. remove bridges 2. connect Udc to L1 and PE 3. connect L2 to PE |
1. connect EUT to L and PE 2. press button EUT power (green) 3. choose Test DIPS long 4. Choose test and interruption time |
![]() |
See manual TRANSIENT-1000
|
|
|
|
|
|---|---|---|---|
|
|
|
||
| 1. Use power supply number 1 with Udc 2. Use power supply number 2 for Ux |
1. remove bridges 2. connect Udc to L1 and PE 3. connect power supply Ux to L2 and PE |
1. connect EUT to L and PE 2. press button EUT power (green) 3. choose Test DIPS long 4. choose test and interruption time |
![]() |
When the EUT can not be connected with the protection earth the coupling kit CNDKIT1000 must be used. See manual CDNKIT1000.
Same setting as described in the column "front side".